Use este identificador para citar ou linkar para este item:
http://hdl.handle.net/123456789/6716
Título: | A utilização do BIM 4D para o processo de planejamento e controle de obras: uma revisão sistemática da literatura entre os anos de 2018 e 2023 |
Título(s) alternativo(s): | The use of BIM 4D for the process of planning and control of works: a systematic review of the literature between the years 2018 and 2023 |
Autor(es): | COSTA, Juliana Ferreira |
Palavras-chave: | BIM; BIM 4D; planejamento e controle de obras; BIM; BIM 4D; planning and control of works. |
Data do documento: | 7-Jul-2023 |
Editor: | Universidade Federal do Maranhão |
Resumo: | RESUMO O BIM (Building Information Modeling) propicia a administração da informação podendo suceder no decorrer de todas as etapas que são realizadas em uma obra, empregando um conjunto de informações do próprio projeto, estando aliado assim a uma modelagem que é feita em três dimensões. O presente trabalho tem como objetivo evidenciar as principais pesquisas relacionadas ao BIM 4D para o setor da construção civil. Com o intuito também de cooperar com estudos sobre o BIM e trazer mais informações à universidade e ao público em geral sobre essa temática. Devido ao grande avanço nas tecnologias utilizadas na construção civil, desde os anos 2000, o BIM se apresenta como uma nova metodologia de trabalho e uma nova tendência para a engenharia digitalizada. A metodologia adotada na presente pesquisa foi a Revisão Sistemática da Literatura (RSL) que resultou em um total de 423 trabalhos com dados qualitativos e quantitativos, e ainda divide-se em três pontos: planejamento, realização e divulgação. Os trabalhos foram analisados no mês de Maio de 2023, e sua distribuição ocorreu entre os anos de 2018 e 2023. A aplicação do BIM 4D que foi trazida para o planejamento e controle de obras, pode ser identificada por meio de um filtro nos artigos para que se pudesse direcionar melhor a temática da pesquisa. Por meio da leitura, foram levantados pontos em comum entre as pesquisas que colocaram em prática o gerenciamento de obras utilizando o BIM. Utilizando-se a especificação “BIM 4D” e a base de dados da Scielo, Periódicos Capes e Sience Direct pode-se obter dados confiáveis e relevantes para a pesquisa. Percebe-se que, após a última filtragem dos trabalhos, na análise do gráfico de barras 2, que 54, 55% dos artigos são referentes ao ano de 2023, 18,19% são de 2022 e os 27,26% restantes são distribuídos igualmente entre os anos de 2021 (9,09 %), 2020 (9,09%) e 2018 (9,09%). As pesquisas mais relevantes foram as de 2023, visto que as essas são as mais atualizadas e relevantes para a temática abordada.___ABSTRACT The BIM (Building Information Modeling) platform provides the management of information that can occur during all the stages that are carried out in a work, using a set of information from the project itself, thus being combined with a modeling that is done in three dimensions. The present work aims to highlight the main researches related to BIM 4D for the civil construction sector. Also, with the aim of cooperating with studies on BIM and bringing more information to the university and the general public on this topic, as it is necessary to understand how this work methodology works. Due to the great advances in the technologies used in civil construction, since the 2000s, BIM presents itself as a new work methodology and a new trend for digitized engineering. The methodology adopted in this research was the Systematic Review of the Literature (RSL) which resulted in a total of 423 studies with qualitative and quantitative data, and is further divided into three points: planning, realization and dissemination. The works were analyzed in the month of May 2023, and their distribution occurred between the years 2018 and 2023. The application of BIM 4D that was brought to the planning and control of works, can be identified through a filter in the articles for that could better direct the theme of the research. In the considered databases, a search was performed with the keyword “BIM 4D”. Through reading, common points were raised between the researches that put into practice the management of works using BIM. Using the “BIM 4D” specification and the Scielo, Periódicos Capes and Sience Direct databases, reliable and relevant data for the research can be obtained. It is noticed that, after the last filtering of the works, in the analysis of bar chart 2, that 54, 55% of the articles refer to the year 2023, 18.19% are from 2022 and the remaining 27.26% are distributed equally between the years 2021 (9.09%), 2020 (9.09%) and 2018 (9.09%). The most relevant surveys were those from 2023, as these are the most up-to-date and relevant to the topic addressed. From this, it can be verified that the adoption of the systematic literature review as a methodology was efficient to carry out the investigation on the impact of BIM 4D during the process to carry out the planning, as well as the control of works during the years of 2018 and 2023. |
URI: | http://hdl.handle.net/123456789/6716 |
Aparece nas coleções: | TCCs de Graduação em Engenharia Civil do Campus de Balsas |
Arquivos associados a este item:
Arquivo | Descrição | Tamanho | Formato | |
---|---|---|---|---|
JulianaCosta.pdf | Trabalho de Conclusão de Curso | 650,13 kB | Adobe PDF | Visualizar/Abrir |
Os itens no repositório estão protegidos por copyright, com todos os direitos reservados, salvo quando é indicado o contrário.